Analysing different schemes using multiple Timelines
If you want to analyse two different schemes (different design iterations of one site using different ‘lgm’ files) in a single batch run, you can duplicate the Timeline settings of one scheme, change one or more of its outputs and use both Timelines within a batch run.
To analyse different schemes using multiple Timelines:
- Load one of the schemes (Option A) and save its ‘ana’ file.
- Define all pertinent maps and analyses for the scheme.
- Set up a Timeline and call it something like ‘Timeline–A’.
- In the ‘Edit Timeline Settings’ dialog, copy this Timeline and rename it ‘Timeline–B’.
- Identify any Analysis Zones or Lines whose position in the scheme Option B should be different (for example an Analysis Line placed to measure flow for a gateline in Option A which has been moved in Option B).
- Identify the corresponding Analyses for any of these, copy them and rename them to identify them as belonging to Option B.
- Create new Analysis Lines or Zones whose position is correct for the Option B scheme and name them as belonging to Option B.
- Associate the newly created Analyses Line with the Analyses you created in step 6.
- In Timeline–B, identify the relevant Save Graph events and modify them so that they output data from your Option B Analysis.
- Finally, In the ‘Batch Run’ dialog, associate Timelines A and B with the correct model and source files batches.
- Run the batch.